The seven gas plants
- Alan Miller, "8-year-old to officials considering 7th power plant for New Albany data centers," The Reporting Project, Oct. 23, 2026. thereportingproject.org
- Will-Power OH, "Notice of Compliance, Completion and In-service Dates," OPSB case 25-0185-EL-BLN, filed July 22, 2026. PUCO docket
- Will-Power OH, "Notice of Completion and In-service Date," OPSB case 25-0188-EL-BGN, filed Nov. 3, 2026. PUCO docket
- "Ohio Power Siting Board approves fifth natural gas power plant in New Albany," Farm and Dairy, June 30, 2026 (farmanddairy.com); OPSB case 26-0169-EL-BLN (docket).
- PowerConneX New Albany, "Notice of Compliance with Condition 3: Start of Construction Date," OPSB case 25-0090-EL-BLN, filed Aug. 12, 2025. PUCO docket
- OPSB case 25-0302-EL-BGN, Opinion and Order, Nov. 20, 2025, and start-of-construction notice, Dec. 2, 2025. PUCO docket
- Joint Stipulation and Recommendation, OPSB case 26-0627-EL-BGN, filed Oct. 19, 2026. PUCO docket
- Joint Stipulation and Recommendation, OPSB case 26-0361-EL-BGN, filed Nov. 2, 2026. PUCO docket
- Kevin Clark, "Onsite gas turbines, reciprocating engines to power Meta data center," Power Engineering, June 11, 2025. power-eng.com
- Ohio EPA, public comment page for draft permit P0139969, "Will-Power OH, LLC - STY," viewed Nov. 5, 2026 (ohioepa.commentinput.com); emission figures from Save Ohio Parks, "Tell the Ohio EPA: No air permit for Meta's third polluting gas plant," Oct. 14, 2026 (saveohioparks.org).
- Ohio EPA final permit-to-install P0137967, Aug. 19, 2025, filed in OPSB case 25-0090-EL-BLN. PUCO docket
- OPSB Staff, "Staff Report of Investigation," case 26-0627-EL-BGN, Oct. 1, 2026. PUCO docket
- OPSB Staff, "Staff Report of Investigation," case 26-0361-EL-BGN, Oct. 16, 2026, including pp. 26–27 on the Ohio EPA permit. PUCO docket
- City of New Albany, "Energy Centers: Frequently Asked Questions," Oct. 2026 (PDF), and "Natural Gas Power" (newalbanyohio.org).
- Transcript of the Oct. 21, 2026 evidentiary hearing, OPSB case 26-0627-EL-BGN, filed Nov. 3, 2026. PUCO docket
- Ohio EPA, public comment page for draft permit P0140005, "EdgeConneX New Albany North," viewed Nov. 5, 2026. ohioepa.commentinput.com
- Save Ohio Parks, "Act Now: Tell Ohio NO on two polluting gas plants," Sept. 23, 2026 (saveohioparks.org), and testimony of Oct. 6, 2026 (saveohioparks.org).
- Trinity Consultants for EdgeConneX, "Exhibit E: Permit to Install Application," Table 3-1, OPSB case 26-0361-EL-BGN, filed July 24, 2026. PUCO docket
The city's position & the incentives
- City of New Albany, "New Albany Data Centers," accessed Nov. 5, 2026. datacenters.newalbanyohio.org
- City of New Albany, "Frequently Asked Resident Questions," accessed Nov. 5, 2026. datacenters.newalbanyohio.org/resident-questions
- City of New Albany, "Our Community," data center site, accessed Nov. 5, 2026. datacenters.newalbanyohio.org/our-community
- City of New Albany, "Natural Gas Power," accessed Nov. 5, 2026. newalbanyohio.org/natural-gas-power
- The same page as archived on Apr. 26, 2025, Nov. 8, 2025 and Apr. 17, 2026, Internet Archive.
- City of New Albany, Council Minutes, May 19, 2026 (PDF), and Adopted Legislation, May 19, 2026, O-07-2026 (PDF); see also O-47-2025 in Adopted Legislation, Jan. 6, 2026 (PDF).
- City of New Albany, Council Minutes, Oct. 6, 2026 (PDF), and Adopted Legislation, Oct. 6, 2026, R-38-2026 through R-40-2026 (PDF).
- City of New Albany, Adopted Legislation, Aug. 19, 2025, O-33-2025, §1144.02. (PDF)
- City of New Albany, Council Minutes, Sept. 16, 2025. (PDF)
- City of New Albany, Council Minutes, Dec. 16, 2025 (PDF), and Adopted Legislation, Dec. 16, 2025, R-46-2025 (PDF).
- Sabriel Metcalf, "Ohio board hears concerns over proposed New Albany data center power plant," Spectrum News 1, Oct. 7, 2026. spectrumnews1.com
- Sarah Donaldson, "New Albany City Council approves 30-year tax break for Amazon data centers," NBC4, Sept. 20, 2023. nbc4i.com
- "Microsoft and New Albany to build $420 million data center," WSYX, Oct. 2, 2024 (cwcolumbus.com); "Microsoft to Construct Data Center Project in New Albany," New Albany Business, Oct. 4, 2024 (newalbanybusiness.org).
- Zach Schiller, "Indefensible tax breaks for data centers will cost Ohio," Policy Matters Ohio, Jan. 7, 2025. policymattersohio.org
- "Data center company QTS investing $1.5B into New Albany," ABC6, Oct. 23, 2023. abc6onyourside.com
- Office of Gov. Mike DeWine, Tax Credit Authority press release, Dec. 11, 2023, as archived. politicalemails.org
- Aaron Burd, "$185 million data center coming to New Albany after tax exemption approved," NBC4, June 28, 2024. via Yahoo Finance
- David Trinko, "Ohio Throws Hundreds of Millions to Tech Giants' Data Centers," The Lima News, republished by Governing, July 29, 2024. governing.com
- "Google Announces New Investment in New Albany," New Albany Business, June 19, 2024. newalbanybusiness.org
- City of New Albany, "City Finances," data center site, accessed Nov. 5, 2026. datacenters.newalbanyohio.org/city-finances
- Signal Ohio via the Associated Press, "Ohio data center tax break cost $1.4 billion more than expected in 2025," May 21, 2026. cleveland19.com
- Sarah Donaldson, "Following DeWine's veto, sales tax break for Ohio data centers survives — for now," Statehouse News Bureau, Aug. 8, 2025. wvxu.org
- "Governor DeWine Announces Pause of Data Center Tax Exemption," reprinting the governor's release, May 27, 2026. clermontsun.com
- City of New Albany, Council Minutes, July 7, 2026, p. 8. (PDF)
- City of New Albany, Council Minutes, April 21, 2026, pp. 2–3. (PDF)
- Kent Mallett, "New Albany annexation, development 'transformational' for Jersey Township," Newark Advocate, Jan. 13, 2022. via Yahoo News
- City of New Albany, Adopted Legislation, June 16, 2026, R-20-2026. (PDF)
- City of New Albany, Adopted Legislation, Sept. 16, 2025, O-21-2025 and exhibits. (PDF)
- City of New Albany, Council Meeting Agenda, Nov. 3, 2026, pp. 1–3: item 6, "Hearing of Visitors," with the Ohio Power Siting Board presentation, and the legislation listed in items 10–12. (PDF)
- Robert Dove, Kegler Brown Hill + Ritter, for City Manager Joseph F. Stefanov, "Notice of Intervention by the City of New Albany," OPSB case 26-0361-EL-BGN, filed June 24, 2026, pp. 1–2 (quote p. 1). PUCO docket
- Administrative Law Judge, Entry, OPSB case 26-0361-EL-BGN, Sept. 16, 2026, ¶¶ 4, 7, 22. PUCO docket
- OPSB Staff, "Staff Report of Investigation," PowerConneX New Albany 3, case 26-0361-EL-BGN, Oct. 16, 2026, p. 3 (rehearing and appeal), p. 35 (the city's intervention and the aesthetics condition) and pp. 38–44 (39 recommended conditions). PUCO docket
- PowerConneX, City of New Albany and OPSB Staff, "Joint Stipulation and Recommendation," case 26-0361-EL-BGN, filed by Christine M.T. Pirik for PowerConneX, Nov. 2, 2026, 1:27 p.m. (file stamp). Quotes: p. 2 (recommendation, "lengthy, serious bargaining"), p. 3 (Conditions 2 and 6), p. 9 (Condition 41), p. 11 ("expressly conditioned," rehearing and withdrawal), p. 12 ("carries no factual or legal precedent"; subsidiary of EdgeConneX), pp. 12–15 (agreed findings and conclusions), p. 15 (authority), p. 16 (signatures). PUCO docket
- Macy Ramsey, EdgeConneX and PowerConneX, "Supplemental Testimony," case 26-0361-EL-BGN, filed Nov. 2, 2026, pp. 3–4. PUCO docket
- OPSB case 26-0361-EL-BGN, case record (68 documents), viewed Nov. 5, 2026. PUCO docket
- City of New Albany, City Council meeting video, Nov. 3, 2026, and its transcript, which the city's video host says was "compiled from uncorrected Closed Captioning." Approximate times: Williams 0:05–0:55, staff on special counsel 0:27–0:37, city attorney 0:55–1:00, residents on the settlement 1:20–1:25 and 1:40–1:45. We paraphrase it rather than quote it. newalbanyoh.new.swagit.com
- Alan Miller, "New Albany mayor and council told to 'do better' in protecting area residents from gas-fired power plant pollutants," The Reporting Project, Nov. 5, 2026. thereportingproject.org
- City of New Albany, Council Minutes, Oct. 20, 2026, pp. 11–12. (PDF)
- "Joint Stipulation and Recommendation," NEO Power Generation Facility, OPSB case 26-0627-EL-BGN, filed Oct. 19, 2026, p. 23 (city signature) (PUCO docket), and Administrative Law Judge Entry granting the city's petition to intervene, filed Oct. 19, 2026 (PUCO docket).
- Transcript of the Oct. 21, 2026 hearing, OPSB case 26-0627-EL-BGN, filed Nov. 3, 2026, pp. 6–7, 14, 22–24. PUCO docket
- Ohio Power Siting Board, Opinion and Order, Socrates North, case 25-0188-EL-BGN, Sept. 18, 2025, ¶¶ 62–63 (p. 20) and ¶ 64 (pp. 26–27, "substantial weight" and the three questions, spelling as in the original). PUCO docket
- Ohio Administrative Code 4906-2-24(D). codes.ohio.gov
- Ohio Administrative Code 4906-2-12(A)(1). codes.ohio.gov
- Ohio Revised Code 4906.08(C). codes.ohio.gov
- City of New Albany, council meeting agendas, Sept. 16, 2025 through Nov. 3, 2026 (34 agendas: 27 regular meetings plus organizational, special and workshop meetings), searched for "Siting," "OPSB," "interven," "stipulat," "Kegler," "PowerConneX" and "counsel," Nov. 5, 2026. City Council Business
- City of New Albany, "2026 New Albany City Council Regular Meeting Schedule." (PDF)
- OPSB case 26-0169-EL-BLN (Socrates the Younger), case record: city notice of intervention filed Apr. 1, 2026, granted Apr. 28, 2026, viewed Nov. 5, 2026. PUCO docket
- Ohio Revised Code 5709.83, notice to school boards of proposed tax exemptions. codes.ohio.gov
Water, the grid & your electric bill
- City of New Albany, "Resident Questions," data center information site, undated, accessed Nov. 5, 2026. datacenters.newalbanyohio.org/resident-questions
- Michelle Jarboe, "How much water do data centers really use? Here's what we learned from public records," The Price of Data, News 5 Cleveland / Scripps News, 2026. news5cleveland.com
- Google, 2026 Environmental Report, "Water use by data center location 2025," p. 97. sustainability.google (PDF)
- Google, 2025 Environmental Report, "Water use by data center location 2024," p. 110. gstatic.com (PDF)
- Meta, 2025 Environmental Data Index, "Water Withdrawal by Facility." sustainability.atmeta.com
- Mandy Crispin and Alex Cossin, "Columbus explores water reuse to support data center growth and long-term water supply needs," WaterWorld, June 23, 2026. waterworld.com
- George Shillcock, "Columbus City Council considers data center regulations, including water usage requirements," WOSU, July 21, 2026. wysu.org
- Nora McKeown Cleveland, data center tariff coverage, Spectrum News 1 Columbus, Sept. 2025. spectrumlocalnews.com
- AEP Ohio, "AEP Ohio Updates PUCO on Data Center Load Under Contract," press release, Feb. 13, 2026 (release), and the PUCO filing (docket).
- Public Utilities Commission of Ohio, "PUCO orders AEP Ohio to create data center specific tariff," July 9, 2025 (release); Vorys, client alert on the order, July 11, 2025 (vorys.com).
- AEP Ohio, "Data Center Tariff," accessed Nov. 5, 2026. aepohio.com
- Ohio State University Agricultural & Resource Law Program, "Data center controversies continue in Ohio," April 6, 2026. farmoffice.osu.edu
- Renee Fox, "AEP Ohio gives notice for new high-voltage transmission lines to meet growing energy demands," WOSU, March 28, 2024. wosu.org
- AEP Ohio, "Kiber 138-kV Transmission Line Project" fact sheet, Dec. 19, 2025. aeptransmission.com (PDF)
- Renee Fox, "State utility officials approve AEP Ohio's building onsite energy generators at two data centers," WOSU, May 28, 2025. wosu.org
- PUCO Chair Jenifer French, comments before the Ohio House Select Committee on Data Centers, May 27, 2026. legislature.ohio.gov (PDF)
- Katie Millard, "New Albany gets small electric grid to power new data center," NBC4, 2026. nbc4i.com
- PJM, "PJM Capacity Auction Procures Sufficient Resources To Meet RTO Reliability Requirement," July 30, 2024. pjm.com (PDF)
- PJM, "PJM Auction Procures 134,311 MW of Generation Resources; Supply Responds to Price Signal," July 22, 2025. pjm.com (PDF)
- PJM, "PJM Auction Procures 134,479 MW of Generation Resources," Dec. 17, 2025. pjm.com (PDF)
- PJM, "PJM Capacity Auction Procures 138,318 MW of Generation Resources as Work Continues To Address Growing Electricity Demand," July 14, 2026. pjm.com (PDF)
- Monitoring Analytics (PJM independent market monitor), "Analysis of the 2025/2026 RPM Base Residual Auction, Part G (Revised)," June 3, 2025. monitoringanalytics.com (PDF)
- Monitoring Analytics, "Analysis of the 2026/2027 RPM Base Residual Auction, Part A," Oct. 1, 2025. monitoringanalytics.com (PDF)
- Monitoring Analytics, "Analysis of the 2027/2028 RPM Base Residual Auction, Part A," Jan. 5, 2026. monitoringanalytics.com (PDF)
- Monitoring Analytics, "Analysis of the 2028/2029 RPM Base Residual Auction, Part A," Oct. 30, 2026. monitoringanalytics.com (PDF)
- Kevin Accettulla, "AEP Ohio files for rate increase. Here's how much your bill could go up," NBC4, May 30, 2025. nbc4i.com
- Katie Millard, "How data centers contribute to spiking electric costs in central Ohio," NBC4, Aug. 6, 2025. via Yahoo News
- Ohio Consumers' Counsel, "Quick Facts: Data Centers in Ohio," accessed Nov. 5, 2026. occ.ohio.gov
- Allie Vugrincic, "State utilities commission approves AEP Ohio rate changes," WOSU, April 2, 2026. ideastream.org
- Ohio Legislative Service Commission, "H.B. 15 Final Analysis," July 9, 2025. legislature.ohio.gov
- Ellen Essman, "What's the state of data center legislation in Ohio?," OSU Farm Office, June 25, 2026. farmoffice.osu.edu
Take part
- Ohio EPA, public comment page for draft permit P0140492, Fairfield Energy Center, viewed Nov. 5, 2026. ohioepa.commentinput.com
- Will-Power OH, "Notice of Completion and In-service Date," OPSB case 25-0188-EL-BGN, filed Nov. 3, 2026. PUCO docket
- City of New Albany, "2026 New Albany City Council Regular Meeting Schedule." (PDF)
- Ohio EPA, public comment page for draft permit P0139969, "Will-Power OH, LLC - STY," viewed Nov. 5, 2026. ohioepa.commentinput.com
- Alan Miller, "8-year-old to officials considering 7th power plant for New Albany data centers," The Reporting Project, Oct. 23, 2026. thereportingproject.org
- OPSB case 26-0361-EL-BGN, case record, viewed Nov. 5, 2026. PUCO docket
- OPSB Staff, "Staff Report of Investigation," case 26-0361-EL-BGN, Oct. 16, 2026, pp. 1–3. PUCO docket
- PUCO Docketing Information System, "File a Public Comment," viewed Nov. 5, 2026. dis.puc.state.oh.us
- City of New Albany, "Energy Centers: Frequently Asked Questions," Oct. 2026. (PDF)
- OPSB news release, "OPSB schedules local hearing for proposed natural gas power plant in Licking County," Sept. 16, 2026 (govdelivery.com); PUCO, 180 E. Broad St., Columbus.
- Ohio Revised Code 4906.08. codes.ohio.gov
- Ohio Administrative Code 4906-2-12. codes.ohio.gov
- Joint Stipulation and Recommendation, OPSB case 26-0627-EL-BGN, filed Oct. 19, 2026. PUCO docket
- Joint Stipulation and Recommendation, OPSB case 26-0361-EL-BGN, filed Nov. 2, 2026. PUCO docket
- OPSB news release, Sept. 16, 2026 (as source 10). govdelivery.com
- Ohio EPA final permit P0137967 cover letter, Aug. 19, 2025, filed in OPSB case 25-0090-EL-BLN. PUCO docket
- City of New Albany, "Natural Gas Power," accessed Nov. 5, 2026. newalbanyohio.org
- City of New Albany, "City Council Business." newalbanyohio.org
- City of New Albany, Council Meeting Agenda, Sept. 1, 2026. (PDF)
- City of New Albany, "City Council & Mayor." newalbanyohio.org
- Ohio House of Representatives, member page for District 4. ohiohouse.gov
- Administrative Law Judge, Entry, OPSB case 26-0361-EL-BGN, Sept. 16, 2026, ¶ 7. PUCO docket
Join us
- U.S. EPA, "Prevention of Significant Deterioration Basic Information," accessed Nov. 5, 2026. epa.gov
- 40 CFR 49.167, definition of "synthetic minor source." law.cornell.edu
- OPSB Staff, "Staff Report of Investigation," case 26-0361-EL-BGN (PowerConneX New Albany 3), Oct. 16, 2026, pp. 26–27 (air permit classification); equipment, farmland and wetland figures in the same report. PUCO docket
- U.S. EPA, "Air Plan Approval; Ohio; Ohio Less Than 10 TPY BAT Exemption," 84 Fed. Reg. 14874, Apr. 12, 2019, describing Ohio Adm. Code 3745-31-05 and 2006 Senate Bill 265. govinfo.gov
- See The seven gas plants for each plant's equipment list from its state filings.
- Google, 2026 Environmental Report, p. 97. sustainability.google (PDF)
- Monitoring Analytics (PJM independent market monitor), "Analysis of the 2028/2029 RPM Base Residual Auction, Part A," Oct. 30, 2026. monitoringanalytics.com (PDF)
- See Water, grid & bills for how PJM's capacity auction reaches household bills, with its sources.
Home
- City of New Albany, "Frequently Asked Resident Questions," accessed Nov. 5, 2026. datacenters.newalbanyohio.org
- See The seven gas plants for each plant's filings. Total and count from The Reporting Project, Oct. 23, 2026 (thereportingproject.org); operating dates from Will-Power OH's filings of July 22 and Nov. 3, 2026 in OPSB cases 25-0185-EL-BLN and 25-0188-EL-BGN (docket).
- Joint Stipulation and Recommendation, OPSB case 26-0627-EL-BGN (NEO), filed Oct. 19, 2026. PUCO docket
- Joint Stipulation and Recommendation, OPSB case 26-0361-EL-BGN (PowerConneX New Albany 3), filed Nov. 2, 2026. PUCO docket
- Monitoring Analytics (PJM independent market monitor), "Analysis of the 2028/2029 RPM Base Residual Auction, Part A," Oct. 30, 2026. monitoringanalytics.com (PDF)
- Google, 2026 Environmental Report, p. 97. sustainability.google (PDF)
- Ohio EPA, public comment page for draft permit P0139969, viewed Nov. 5, 2026. ohioepa.commentinput.com
- City of New Albany, "New Albany Data Centers" and "Our Community," accessed Nov. 5, 2026. datacenters.newalbanyohio.org
- Katie Millard, "New Albany gets small electric grid to power new data center," NBC4, 2026. nbc4i.com
- PUCO Chair Jenifer French, comments before the Ohio House Select Committee on Data Centers, May 27, 2026. legislature.ohio.gov (PDF)
- City of New Albany, "Natural Gas Power," accessed Nov. 5, 2026. newalbanyohio.org